1- RTU/PLC and SCADA Systems 
2- DNP3 protocol configuration
3- PCS7 Telecontrol configuration
4- Pre FAT and FAT 
1. Network switches configuration (Scalance) Qty = 30 Pcs ( Scalance switches complete knowledge required) 
2. VLAN settings. 
3. Ring Topology configuration.Qty = 30 Pcs 
4. System hardening implementation. Qty = 30 Pcs 
5. Layer 2 and Layer3 configuration. 
6. NMR and cabinet drawings review. Qty = 25 cabinets 
7. PLC IO testing with SPHA module. Qty = 8 PLC Cabinets 
8. Panel Inspection and complete testing. Qty = 25 cabinets 
9.Perform Quality Checks. Qty = 25 cabinets 