Registered and Approved Vendor at Siemens energy ksa

Project 1, Engineering for KARAN project (February to March 2024)

1- RTU/PLC and SCADA Systems
2- DNP3 protocol configuration
3- PCS7 Telecontrol configuration
4- Pre FAT and FAT 

Project 2, Engineering Services for Bulk Plant TMS ( April to September 2024)

1. Network switches configuration (Scalance) Qty = 30 Pcs ( Scalance switches complete knowledge required)
2. VLAN settings.
3. Ring Topology configuration.Qty = 30 Pcs
4. System hardening implementation. Qty = 30 Pcs
5. Layer 2 and Layer3 configuration.
6. NMR and cabinet drawings review. Qty = 25 cabinets
7. PLC IO testing with SPHA module. Qty = 8 PLC Cabinets
8. Panel Inspection and complete testing. Qty = 25 cabinets
9.Perform Quality Checks. Qty = 25 cabinets 


Copyright © 2024 Private - All Rights Reserved.

Powered by GoDaddy

  • Products

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept